colligate
英 [ˈkɒlɪɡeɪt]
美 [ˈkɑːlɪɡeɪt]
v. (使)发生紧密联系; (使)结成类联结
现在分词:colligating 过去式:colligated 第三人称单数:colligates 过去分词:colligated
牛津词典
verb
- (使)发生紧密联系
if two ideas, facts, etc. colligate , or are colligated , they are linked together by a single explanation or theory - (使)结成类联结
if two words colligate , or are colligated , they occur together and are linked by grammar
英英释义
verb
- consider (an instance of something) as part of a general rule or principle
- make a logical or causal connection
- I cannot connect these two pieces of evidence in my mind
- colligate these facts
- I cannot relate these events at all
双语例句
- It is a medium base of colligate mechanism processing and it is a specialism company of design and processing of mechanism and mode.
是综合机械加工制造的中型基地,是专门从事机械模具设计、加工制造的专业企业。 - Colligate the observation and the experiences from experienced teachers in front line, we'll find that the learning embarrassment is centralized in three aspects including the conversion between different thinking manners, learning strategies and meta-cognition.
综合对学习者的观察和一线教师的体验,发现学习问题主要集中在思维转换、认知方法和元认知能力三个方面,而且各类问题有其形成的原因和表现。 - In the third chapter, according to the correspond structure of the general curriculum theory, the writer expound the aim, content, implement, and evaluation of the art and science colligate curriculum, aimed to shape the general frame.
第三章中,笔者依据普通课程理论的相关结构,对美术与科学综合课程的目标、内容、实施与评价进行了阐述,以期形成这一综合课程的总体框架。 - In the end, combined with the business re-engineering theories, a case study of colligate operation system in ICBC is introduced.
最后结合所得商业银行业务流程再造理论对工商银行综合业务系统中的资金汇划业务进行案例分析。 - The underground pipeline colligate alure in city is also say "Utility tunnel".
城市地下管线综合管廊俗称共同沟。 - The third, Deepening colligate reform to secondary vocational school technique education.
第三,不断深化对中等职业技术教育的综合改革。 - Design& Construction of Campus Computer Network System Colligate Wiring
校园计算机网络综合布线设计与施工 - Chapter 4, the colligate analysis about engineering machine lease marketing strategies of HOPE.
霍普公司工程机械租赁营销综合分析。 - Study on Colligate Optimal Kinematics and Dynamics Design of Hydraulic Excavator s Parametric Modeling; Prepare of Monitor Equipment Double-power Supply Automatic Changing-over in Mine
液压挖掘机工作装置运动与动力综合优化研究矿用监测设备双电源自动切换装置的研制 - Research on Composite Structural Analysis and Dynamic Identification of Hydropower House; Air conditioning System Design of the Foxconn N Colligate Industry Plant in Shenzhen
水电站厂房组合结构分析与动态识别深圳富士康N综合工业厂房空调设计